Enable resource loading on summary tasks

would like the ability to resource load summary tasks or ability to create a hammock task that will adjust based upon duration of a network of tasks thus adjusting total project resouce requirements as project duration change. Example usage in construction would be: costing of general conditions, select engineering oversight during site work, or costing of tower crane.